![factory town development goals factory town development goals](https://i1.wp.com/nnn.ng/wp-content/uploads/2022/03/biovac-development-partners-80x80.jpg)
Oil comes from the bowels of the earth with plenty of water which soaks up many minerals and radioactive elements on its way to the surface. Half an hour´s drive from the centre of the city, the landscape is dominated by abandoned derricks and oil rigs surrounded by pools of stagnant water. With surging oil prices the oil boom continues but took its toll. The city´s fortune was made in the 19 th century with the large-scale oil extraction and the elegant buildings are a testament to wealth. Still standing in the city centre are the medieval stone caravanserais - the homes for travelling caravans - where merchants bargained over their wares. Thanks to this action, the disposed scraps have been reduced by 70% vs 2007 and 1.600.Baku, the capital of Azerbaijan has been an international trading hub for two thousand years. The Recycling Department recovers post production and post installation scraps.This enables to have: - Higher efficiency of thermal and electricity production - Reduction of CO2 emissions (- 184 tons/year) This fluid feeds an absorption refrigeration unit to produce cold water at 17☌. The heat recovered from cooling circuit of engine is used to generate hot water. By cooling of fumes of the engine, it is possible to obtain high temperature heat to be used for the production of superheated water for the curing process in ovens dept. The Trigeneration System is the simultaneous production of electricity, heating and cooling power from a single device (gas engine).Reduction of the curing time of linoleum by 2 days per oven Reduce oven gas consumption by –106000 m³/year The insulation is being expanded to all of the other ovens. The eastern oven is thermally insulated to increase the plant energy efficiency.Reduce oven gas consumption by - 278540 m³/year A biomass boiler has been installed: it is fed with internal biomasses and when they are boiled, it produces hot water to heat the ovens.There is no production waste that goes to a landfill. The closed cycle we implemented enables to recover linoleum paste as well as jute and powders during the process in order to reuse them to replace virgin raw materials. During the calendering process, wastes, process scraps and end-of-use products enter into a biological or technical cycle.
![factory town development goals factory town development goals](https://www.as-p.com/fileadmin/_processed_/import2018/5/e/csm_Keyvisual_4__Einfuehrungsseite_Abuja_Emptyform_Tjie_Boulevardview_Final_Print_opt_dbcfaf3eb6.jpg)
reduce oven gas consumption by -59136 m³/year reduce the time needed to cure the linoleum flooring by 7 days,
![factory town development goals factory town development goals](https://zeboto.in/wp-content/uploads/2021/04/web-design1.png)
This system is being expanded to more ovens and enables to: An Air Dryer equipment heats and dehumidifies the suppled air inside the ovens.This has enabled to reduce gas consumption by - 804782 m³/year. The factory has been equipped with three heat exchangers to recover the heat from post combustor oxidation, the post combustor trimming line and gas boiler emissions.Various types of equipment have been installed in the factory to reduce the consumption of natural resources and also have a positive impact on the production process. Our teams at the Narni factory are taking sustainable initiatives in various fields.
FACTORY TOWN DEVELOPMENT GOALS ISO
Today the factory is accredited ISO 9001 (Quality System) and holds important environmental certifications including ISO 14067 (Greenhouses Gases – Carbon Footprint of Products), ISO 50001 (Energy Management System), ISO 14001 (Environmental Management System), OHSAS 18001 (Health and Safety Management System) and SA 8000 (Social Accountability). The efficiency of the production and the quality of the products have been continuously improved. Tarkett has been improving the production processes and innovating ever since to make Narni become a Green Factory that continuously strives to make production processes even more environment-friendly. The Sommer Group acquired the plant in 1987 and merged with Tarkett in 1997. In the late 19th century, the presence of a railway together with water from the Nera, fertile soil for growing flax, and the town’s position at the geographic centre of Italy made it ideal for manufacturing linoleum.īuilt in 1889, the factory was subsequently acquired by Giovan Battista Pirelli and in 1898 became the Società Italiana del Linoleum. Historically, Narni’s strategic location overlooking a narrow gorge on the River Nera led the romans to fortify it as part of the ancient via Flaminia. Tarkett’s Lino has been manufactured in the Narni factory in Italy since 1898.